Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Abdelaty, A F A (2017) Data-driven algorithms for enhanced transportation infrastructure asset management, Unpublished PhD Thesis, , Iowa State University.

Al Shalabi, F A (2016) BIM framework for energy and maintenance performance assessment for facility management, Unpublished PhD Thesis, , Iowa State University.

AlBughdadi, A J M (2022) Advanced decision support tools for bridge asset management, Unpublished PhD Thesis, , Iowa State University.

Azmy, N (2012) The role of team effectiveness in construction project teams and project performance, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Barbosa Resende, C (2021) Post-construction evaluation for work zones and construction engineers' training, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Barutha, P J (2018) Integrated project delivery for industrial projects, Unpublished PhD Thesis, , Iowa State University.

Canales Fernandez, A R (2004) Developing effective integration between American supervisors and hispanic craft workers in construction, Unpublished PhD Thesis, , Iowa State University.

Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals, Unpublished PhD Thesis, , Iowa State University.

El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling, Unpublished PhD Thesis, , Iowa State University.

Elmisalami, T E (2001) Developing a multi-attribute utility model (MAUM) for selecting information technologies in the construction industry, Unpublished PhD Thesis, , Iowa State University.

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model, Unpublished PhD Thesis, , Iowa State University.

Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts, Unpublished PhD Thesis, , Iowa State University.

Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control, Unpublished PhD Thesis, , Iowa State University.

Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Kawal, D E (1970) A systems model of a construction firm, Unpublished PhD Thesis, , Iowa State University.

Lueth, P L O (2008) The architectural design studio as a learning environment: A qualitative exploration of architecture design student learning experiences in design studios from first- through fourth-year, Unpublished PhD Thesis, , Iowa State University.

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML), Unpublished PhD Thesis, , Iowa State University.

McCann, M (1986) An application of convex programming to construction scheduling, Unpublished PhD Thesis, Industrial and Manufacturing Systems Engineering, Iowa State University.

Mohd Zainudin, N (2019) Identification and analysis of worker safety hazards in Midwest agribusiness construction work sites, Unpublished PhD Thesis, Agricultural and Biosystems Engineering, Iowa State University.

Nahvi, A (2019) Integrated stochastic economics performance evaluation of horizontal infrastructure systems, Unpublished PhD Thesis, , Iowa State University.

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods, Unpublished PhD Thesis, , Iowa State University.

Rahbar, F (1997) Computer-aided parametric planning (CAPP), Unpublished PhD Thesis, , Iowa State University.

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques, Unpublished PhD Thesis, , Iowa State University.

  • Type: Thesis
  • Keywords: construction cost; highway; decision making; repetitive construction; stochastic analysis
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1797918472
  • Abstract:
    The use of Indefinite Delivery/Indefinite Quantity (IDIQ) contracting by state transportation agencies for the procurement of repetitive construction and maintenance services has been growing during the last few years. An IDIQ contract is a multi-project, multi-year mechanism to permit an agency to essentially hire a contractor on a stand-by/as-needed basis to provide a specified set of construction services. A study conducted for the development of the National Cooperative Highway Research Program (NCHRP) Synthesis 473: IDIQ Contracting Practices found that at least 32 departments of transportation (DOT) are using IDIQ contracts for the procurement of construction and/or maintenance projects. As part of the development of Synthesis 473, surveys were sent to all state DOTs asking about their IDIQ contracting practices, their perceived benefits and drawbacks, and the challenges faced during the implementation of this alternative contracting method. The analysis of survey responses showed that state transportation agencies are satisfied with the benefits they are obtaining from IDIQ contracts, but they do not know whether or not they are paying a premium for its benefits. A close look at the issue revealed that the agencies do not have the tools to reliably quantify the cost implication of using IDIQ contracting. This dissertation constitutes the first research initiative intended to address this issue through the development of an IDIQ project selection framework based on the comparison between the estimated costs for a given project if procured under IDIQ versus the costs if traditional Design-Bid-Build (DBB) techniques are used. The proposed framework combines a qualitative assessment of a candidate project’s scope with a stochastic analysis of its construction costs. Once a transportation project’s scope is deemed a suitable candidate for IDIQ contracting (qualitative assessment), the final decision is made using a comparison between the estimated cost of the IDIQ project and its cost if procured through traditional DBB methods (stochastic analysis). Thus, the decision making framework proposed in this study provides public transportation agencies with a tools to both identify and justify delivering a given scope of repetitive work using IDIQ based on the agency’s perception of a reasonable cost for the benefits offered by IDIQ contracting. This dissertation also describes research efforts conducted to identify opportunities to improve IDIQ contracting procedures currently in use by state DOTs to increase budget control and optimize project construction costs. It should be noted that many of the findings of this research have already been implemented by the Minnesota DOT and are currently in use in the field.

Shrestha, K P (2016) Data analytics and visualization for enhanced highway construction cost indexes and as-built schedules, Unpublished PhD Thesis, , Iowa State University.

Sirotiak, T L (2008) The effect of problem/project-based learning on a desired skill set for construction professionals, Unpublished PhD Thesis, , Iowa State University.

Smadi, O G (2000) Knowledge-based expert system pavement management optimization, Unpublished PhD Thesis, , Iowa State University.

Talbot, J (2021) Understanding housing reconstruction in Puerto Rico after hurricanes Irma and Maria, Unpublished PhD Thesis, , Iowa State University.

Tapia, R M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Woldesenbet, A (2014) Highway infrastructure data and information integration & assessment framework: a data-driven decision-making approach, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.